Sharp LC-20S4US Operation Wartungshandbuch Seite 12

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 84
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 11
LC-20S4U-S
12
Step Part No. Description
1 QCNW-A553WJZZ Extension Cable 30-pin Main (SC1202)-LCD Panel
2 QCNW-A556WJZZ Extension Cable 50-pin Main (SC1201)-LCD Panel
3 QCNW-A555WJZZ Extension Cable 20-pin Main (SC1203)-LCD Panel
»Precautions in servicing the B side (backside) of the main PWB unit
1. Disconnect the FFC from between the main PWB (SC1202) and LCD panel unit (CN1), and then connect the
service-specific extension FFC (flat cable) (QCNW-A553WJZZ).
2. Disconnect the FFC from between the main PWB (SC1201) and LCD panel unit (CN2), and then connect the
service-specific extension cord (QCNW-A556WJZZ).
3. Disconnect the FFC for connection between the main PWB (SC1203) and LCD panel unit (CN3), and then connect
the service-specific extension FFC (flat cable) (QCNW-A555WJZZ).
4. Remove the lock screws from the main PWB, detach the PWB from the chassis frame, and then turn it over to
service.
SC1202
SC1201
SC1203
CN1
CN2
CN3
Main PWB
R/C, LED PWB
Inverter PWB
Operation PWB
1
2 3
Analog PWB
Main PWB
(Side-B)
Seitenansicht 11
1 2 ... 7 8 9 10 11 12 13 14 15 16 17 ... 83 84

Kommentare zu diesen Handbüchern

Keine Kommentare