CarboVis 70x IQ TS Commissioning
3 - 3
ba75950e02 11/2012
Vertical installation For vertical installation, mount the sensor in a position that allows inter-
fering elements in the measuring gap to escape with the current. In the
case of vertical installation, the minimum flow rate is 0.2 m/s so the
measuring gap is kept clean optimally.
Fig. 3-2 Vertical installation
Protection against shocks When installing the sensor, always make sure it cannot knock against
a wall or another obstacle. Make sure the safety margins are sufficient
(e. g. with suspended mounting).
Mount the enclosed shock protectors (see section 3.3.2). Their soft rub-
ber compound absorbs hard impacts.
Fig. 3-3 Sensor with mounted shock protectors
Flow direction
easuring gap opening