
1. Belt
1) Inspection
Check
to
see if
the
belt
is
stained with
dust
or
dirt.
Also make sure
that
there·
is
no
unevenness,
scratch and thinned part.
2)
Replacement
1)
Take
the
belt
off
the
spindle pulley while rotating
the
pulley gradually
by
hand.
2) For applying the
belt,
put
the
belt first on
the
motor
pulley and
then
on
the spindle pulley while
rotating
the
spindle pulley.
Note)
1.
In
putting
on
and
off
the
belt, be careful so
that
it
be
not
caught
by
the
motor
pulley flange.
2. Note
that
there
is
no
difference between
both
sides
of
a new belt.
~
Motor
pullev
Keep
belt
off
the
flange.
2.
PWB
unit
1)
Replacement
1) Take connectors
J3
and
J4
off
PWB.
2) Remove 3
PWB
unit fixing screws (3 mm).
3) Detach
PWB
unit.
4) For reassembly,
take
the
reverse order.
Note)
In
replacing
PWB
unit, it
is
necessary
to
check
which short pins
to
cut
and
whether
or
not
terminal resistor
is
required, depending on which
drive unit
to
use (DRIVE No.).
•
Short
pin: Detach
the
short pins from
the
old
PWB
unit·
and apply
them
to
a new
PWB.
• Terminal resistor:
If
the
old
PWB
unit
has no
terminal resistor, remove terminal
resistor from a new
PWB.
J4
connector
-6-
PWB
unit
fixing
screw (3 mm): 3 pcs.
connector
J1 signal
connector
Socket
Kommentare zu diesen Handbüchern