
C35 Application Note
©2005-2013 SemiLEDs. All Right Reserved
RoHS Compliant www.semileds.com
C35 Application Note V1.3
Subject to change without notice
Page
15
MeasurementandCalibration
IntegrationTime
Alongintegration timewillinducethermalissuesin LEDmeasurements. If theintegration timeis1
sec, the LED junction temperature (Tj) may reach over 50℃, which results in the light output dropping
more than 5%. It is recommended that the integration time is shorter than 25ms in high
power LED
measurements.
RecommendedMethod
1. UsemeasurementinstrumentswhichfollowtheCIE127standards.Theintegrationtimeshould
beshorterthan15ms.
2. Iftheoperatorusesnonstandardtesters,calibratethetesterwiththegoldensamplebefore
measurement.ThegoldensampleshouldbemeasuredbytheinstrumentfollowingCIE127
standards(ea.ISCAS
140B).
Kommentare zu diesen Handbüchern