ER-OIPU
4-4. Drawer open & sense test
(1)
Operation
X Stand-alone test: SW1-40r –5+ON-LINE key ON
Note: SW1-4 = Drawer 1 or SW1-5 = Drawer 2
* Connection test:
Selection of test item+ ENTER key ON
Note: Test item =
Drawer 1 open sense test or Drawer 2
open sense test
(2) Content
The drawer is opened and the drawer open sensor state is
expressed with the print/display (connection test only).
@ Drawer open sensor test (Close test)
Result O
@ Drawer open
Visually check that the drawer is opened.
@ Drawer open sensor test (Open test)
Result 1
@ Drawer close
@ Drawer open sensor test (Close test)
Result O
(3) Check content
X Visually check that the drawer is opened.
X Check the sensor with the print/dispiay (connection test only).
@ Print(Stand-alone/Connectiontest) Drawer1
Drawer2
Testresultis 1+ O+ 1:
TESTO04:OKTESTO05:OK
Test resultis otherthan the above: TEST(I04:ERRTESTO05:ERR
@ Display (connection test only)
Example: DRAWER1 =OPEN
I
Item
{
State
I
Content
I
I
DRAWER1
OPEN/CLOSE
The state of drawer 1 open
sensor is displayed.
I
I
DRAWER2 ~ OPEN/CLOSE
The state of drawer 2 open
sensor is disDlaved.
I
(4) Cancel
Stand-alone test + The print is made and the testis
Connection test + Same as above.
4-5. RS232 loop test
(1)
Operation
X Stand-alone test: SW1-6 + ON-LINE key ON
(2) Content
The loop back test is performed with a service
6705RCZZ).
1)
2)
Control signal test
The test is made with ON/OFF of ER=DR signal.
Data transfer test
terminated.
jig (UKOG-
The loop back data transfer test of OOH- FFH (256Byte) is
performed.
Note: Test is made with the baud rate of 38,400 BPS (the
highest speed).
(3) Check content
Check the print below:
TESTO06:OK
TESTO06: EX
(4) Cancel
The above print is made and the testis terminated.
4-6. Flash ROM & CG ROM sum test
(1) Operation
X Stand-alone test: SW1-7 + ON-LINE key ON
* Connection test:
Selection of test item+ ENTER key ON
(2) Content
1) All data sum test of the flash ROM is performed.
2) Alldata sum test of the CG ROM is performed.
X Display: ROM TEST (Connection test only)
(3) Check content
Check with the following prints.
TESTO07:F-ROMOK
TESTO07:F-ROMERR
NOTE
28F40*****
28F40***** ****: ROMversion
CGROM--
GGROM---
(Normal print)
(Error print)
CGROM ---
(CG ROM not installed)
(4) Cancel
The above print is made and the test is terminated.
47. RAM test
(1) Operation
X Stand-alone test: SW1-8 + ON-LINE key ON
* Connection test: Selection of test item+ ENTER key ON
(2) Content
Tests of RAM 256Kbit x 2 PCS.are made. Memory data must not
be changed immediately before and after the test job.
@ Perform the following process for the memory byte address
(H’400000 - H’40FFFF).
PASS1: Memory save
PASS2: Data OOOOHwrite
PASS3: Data OODOHread & compile, data 5555H write
PASS4: Data 5555H read & compile, data AAAAH write
PASS5: Data AAAAH read & compile
PASS6: Memory data load
@ in case of COMPILE ERR in PASS1 -6 tests, the error print
is made. If there is no error up to the last address, the test is
terminated normally.
@ In addition, the following tests are performed. (For the
specifications of address test, refer to the flowchart on the
next page.)
TEST POINT ADDRESS= H’400000,H’400002, H’400004,
H’400008,H’40001 O,H’400020,
H’400040,H’400080, H’400100,
H’400200,H’400400, H’400800,
H’401000,H’40200(.),H’404000
X Display: RAM TEST (Connection test only)
(Normal
print)
(Error print)
X= 1: ER-DR connection error
2: Not used.
3: TXD-RXD verify error
4: Time out error
10-4