Sharp R-880S Betreibershandbuch Seite 91

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 111
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 90
89
Maintenance Inspection Schedule
A closely followed maintenance program will help to keep
your Thermo King unit in top operating condition. The
following general schedule is provided to assist in monitoring
that maintenance.
For more specific detail, see the maintenance manual for your
unit and to the PreTrip Inspection chapter in this manual.
After first week of operation:
Check belt tension.
Tighten unit mounting bolts.
Check coolant level.
Check refrigerant oil level.
Check refrigerant level
Pretrip 1,200
Hours
2,000
Hours
Annual/
3,000
Hours
Inspect/Service These Items
Microprocessor
Run pretrip test (see “Pretrip Test” in Operating Instructions Chapter).
Engine
Check fuel supply.
Check engine oil level.
Seitenansicht 90
1 2 ... 86 87 88 89 90 91 92 93 94 95 96 ... 110 111

Kommentare zu diesen Handbüchern

Keine Kommentare