70 918496/GP0313
New Machines
1. After starting the engine for the first time, let the engine idle for 15 minutes.
2. After 15 minutes, perform the “Mandatory Safety Shutdown Procedure” on
page 10.
3. Check for proper engine oil pressure, engine oil level, diesel fuel leaks,
engine oil leaks, coolant leaks, and indicator/gauge operation.
4. During the first hour of operation, vary the engine speed and the load, with
short periods of maximum load and engine speed operation.
5. During the first four to five hours of operation, avoid long periods of mini-
mum or maximum load and engine speed operation.
6. During the first 50 hours of operation, check the engine oil pressure and
engine temperature frequently.
7. After the first 50 hours of operation, replace engine oil and engine oil filter,
and check and adjust cooling fan v-belt. See “Changing Engine Oil and Fil-
ter” on page 110, and see “Checking and Adjusting V-belt Tension” on
page 119
8. Check the engine oil and coolant levels frequently and refill as necessary. See
“Checking Engine Oil Level” on page 109, and “Checking Coolant Level” on
page 114.
Driving on Public Roads
Follow the applicable legal regulations of the country where the machine is being
used. Regulations are specified in the operation license or in the vehicle papers.
Important: Only the attachments listed in the operation license or vehicle papers
are admissible for driving on public roads.
1. Follow mandatory accident prevention regulations. Complete a functional
check of:
•Brakes
• Steering
•Lights
2. Empty the bucket (if applicable).
3. On AL 100 Series machines:
a. Lower the lift arm all the way and tilt the attachment hitch back until holes
(C, Fig. 30) in the lift arm align with holes (D) in the tilt pivot arm.
Kommentare zu diesen Handbüchern